When Rome is only half-built: Construction contracts and special damages

A discussion of Grid Electronics v Quandomanzi Investments (Pty) Limited t/a SM Structures (2021/21032) [2024] ZAGPJHC 633

Authors

  • Siyabonga Nyezi Fasken (incorporated in South Africa as Bell Dewar Inc.)

DOI:

https://doi.org/10.15641/jcbm.8.1.1740

Abstract

N/A - case note

Downloads

Download data is not yet available.

Downloads

Published

2025-09-04

How to Cite

Nyezi, S. (2025). When Rome is only half-built: Construction contracts and special damages: A discussion of Grid Electronics v Quandomanzi Investments (Pty) Limited t/a SM Structures (2021/21032) [2024] ZAGPJHC 633 . Journal of Construction Business and Management, 8(1), 1–6. https://doi.org/10.15641/jcbm.8.1.1740